welcome,guest

Water Jet Blasting Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2019-01-28 05:08

  • Browse the number:

    150

Send an inquiries

Company Profile

Flow Jet Technical Wuxi Co.,Ltd

By certification [File Integrity]

Contact: hybyzz(Mr.)  

Email:

Telephone:

Phone:

Area: Jiangsu

Address: Jiangsu

Website: http://www.flowjetech.com/ http://hybyzz.amda-china.com/

New Products
Product details

Description

The pressure and flow of the Water jet blasting machine play a key role in high-efficiency high-pressure water jet cleaning pumps and machines, and the application responds differently to each variable. Generally, hardened deposits respond better to higher pressures, while softer materials are preferably removed with higher flow rates. However, each application is unique and we can help you determine which pressure and flow combination is right for you.


Product Detailed Information

Driven engine: Diesel engine / Electric motor 

Required Speed: 1500 RPM

Pump max working pressure: 2800 Bar

Capacity/Flow Rate: 10~1800L/M

Required engine power: Up to 800kw

Medium: fresh water, sea water, oil.ect

Certification:ISO9001:2008 , CE


Trade Term

MOQ: 1 set

Price Clause:FOB,CFR,CIF,etc

Payment terms: by T/T or western union 

30% deposit and 70% before the shipment

100% T/T if the total amount is less than USD5000

Delivery time: 20~75days, subject to the order quantity

Delivery ways: by sea

Package: standard or as required


Product Testing

Ensuring our customers get the satisfying products, strict test is necessary.

Firstly: the row material will be put in storage after inspect. About casting parts, it must be do UT detection in case defects inside.

Second: During machining period, dimension must be measured after each craft. When finished, the parts are put in storage after finally inspection.

Thirdly:the crankshaft will be do static balancing test .the end product(PUMP) will do hydrostatic test (8~16Hours).Complete will be do noise testing


Please Find More Parameter at Parameter Table

FJ3700 Series



FJ13200 Series



FJ30000 Series



FJ45000 Series



FJ60000 Series

http://www.flowjetech.com/